Flumenthal run-of-river power station
The Flumenthal power station was first put into service in 1970. Following measures to increase the efficiency to 27 MW, the average annual output of the three turbine-generator groups is 146 GWh of renewable hydroelectric power. This corresponds to an increase in electricity production of 6 percent.
In 1993, Alpiq carried out a study to determine how the capacity of the Flumenthal run-of-river power station could be increased. Following successful pilot trials, the work was started in the context of a general overhaul in 2006. The first turbine-generator group was converted by Alpiq during a period of six months in the winter of 2006/2007. The overhaul of the other two groups was carried out staggered over the next two years. The last machine group was put back into service in the spring of 2009. The modernisation of the power station included a general overhaul of the machine groups together with the installation of new turbine shafts and fluidic-modified turbine wheels, the replacement of the electrical control and regulating plant, as well as the station supply and generator equipment.
- Flumenthal river power station now generating additional electricity sufficient to power 1750 households
- Schifffahrt auf der Aare
- Hydropower from the River Aare - Renewable energy from the region PDF (543 KB)
- Hochwasser-Gefahr PDF (152 KB)
- Aarestrom
Hydropower
Large Run-of-River Plants
Switzerland
Flumenthal, Switzerland
27 MW
Alpiq: 100 %
1970 / 2009
110 GWh (2011)
Yes
in service